Kitchen Plumbing & Electrical Renovation Budget Checklist

Materials (35-45%)

Use PPR hot-water pipe throughout; run a dedicated 4mm² copper circuit for the kitchen. If an under-sink heater is planned, buy a switched socket.

Labor (45-55%)

Priced per point (outlet/water): 80-150 CNY per point in most cities; concrete chasing costs ~30% more than brick.

Negotiate Add-ons Upfront

  • Pressure test included? (mandatory, 0.8MPa for 30 min)
  • Demolition and debris removal
  • Boxes, clips and other sundries

Put these into the contract to avoid per-meter surcharges.