中文

Kitchen Plumbing & Outlet Layout Standards

Count

At least 5 double sockets on the counter; 2 under the sink (heater + purifier/disposer).

Heights

  • Counter outlets: 1100mm above floor, away from behind the hob.
  • Under-sink outlets: 500mm, mounted on the side panel away from splash.
  • 16A dedicated circuit for oven/fridge at 500mm.

Dedicated Heater Circuit

Run one 2.5mm² 16A socket under the sink — covers both storage and instant models later.

Waterproofing

Waterproofing 300mm up around the sink; splash-proof boxes on all sockets.